Sharps
The Brief
Sharps was looking for a new set for their latest television advert. With a build-time of just one week and a limited budget, we needed to create a workable design for all.
The Process
After crafting bespoke technical drawings, our production team ordered materials suited to each aspect of the design. Prior to rig day, we tested out our design, constructing it in our work-shop to ensure a smooth-running process. Over the course of 3 days, we installed two room set using 800 meters of timber, 45 sheets of Plywood, 50 litres of paint.
Info
CLIENT: The Gate Films
DATE: 01.09.18
MATERIALS:
40 sqm light floor vinyl
50 litres of paint
150 man hours workshop build time
800 metres 2 x 1 plained all round timber
120 onsite rigging man hours