W Hotels
The Brief
W Hotels required an attention-grabbing installation encouraging King’s Cross Station visitors to stop-by and have their photograph taken. They wanted to be able to hand out dumpling samples and promote the hotel group. Prior to the rig in London, we had a workshop time of 12 days.
The Process
After receiving the client’s visuals, we created a dumpling cart with a height of 5 metres. Crafting technical drawings, our production team pre-built the cart. With a tight turnaround, we meticulously crafted every element including replica mini-dumplings! Installing overnight, we had just 5 hours to rig the set.
Info
CLIENT: The Fabulous Collective
DATE: 18.10.17
MATERIALS:
65 sheets 8mm bendy ply
1080 man hours workshop build time
1.5ton of sand
90 metres of led tape
840 metres 20mm x 20mm x 2m box steel